One thing I knew we’d need was bed linens and towels so I was constantly on the lookout for good deals on those items the last few years we were in the U.S. and was able to bring those when we moved. And they have been a blessing! When we arrived we found thread-bare bedding, faded and holey towels. We also found a kitchen in sad need of pots and pans with lids, decent utensils and storage containers...but those will have to wait.
We didn’t have any time (or money) the first year to do anything other than clean and begin sorting through things dad and mom had left. But by the second year we were ready to start tackling some of the bigger -- and more pressing -- problems.
#1: PLUMBING
Ivan and a friend spent several days last June digging out the old ceramic pipes leading to the septic, finding them broken and overgrown with roots. No wonder we were having trouble!
The sink in that room also needed to be replaced. It was cracked and the metal support legs were buckling. After looking at options, we decided to buy a new sink and have Ivan build an open style vanity to set it in. We found some we liked but we did NOT like the prices. What we’re finding is that products are often cheaply made but exorbitantly expensive. Such was definitely the case with the vanities. Ivan looked at the ones in the stores with no small amount of disdain, knowing he could do a much better job. And so he did...

The bath is not finished but we're getting there.
I’ve been on the lookout for a medicine cabinet and *blech* the choices are limited and (in my opinion) UGLY. We’ll probably just make our own, using the same wood as the vanity. What I have in mind is a simple shadow box style with a mirrored back and one shelf about six inches up from the bottom of the box. Since this is a vacation house we don’t need a ton of permanent medicine cabinet storage.
Next up on the plumbing agenda was finding the grease pit and cleaning it out. Ivan could not remember where the pit was so it took a couple of visits and lots of digging to find it, but eventually he did! Our favorite ferreteria owner (the Argentine version of the Ace Hardware man) recommended Ivan add caustic soda and 250 grade peroxide to the grease pit to further break up years of accumulated YUCK.
The final plumbing project was accomplished this past week: installing a new plastic water tank on the roof to replace the old, poured cement one that keeps cracking and leaking. It took three long days, and a lot of back breaking work (literally! Ivan had to break up cement to get to the old pipes) before he had the tank installed and operational.
Now, if only they’d run the natural gas lines out here too! I like the coziness of the wood stove in winter, but it would also be nice (to say nothing of being more convenient) to have a few gas wall heaters strategically placed in the house.
Meanwhile, I wait and hope.
1 comment:
This is so cool! I love what you are doing with this cottage. I'm looking forward to following your progress and that vanity is beautiful!!
Post a Comment